0.2-2X1250 Hydraulic Slitting Line
1.Main Parameters
NO. |
Name |
Unit |
Parameters |
1 |
Control model |
|
Frequency conversion control |
2 |
Material |
|
CRS/Galvanized steel coils |
3 |
Thickness |
mm |
0. 2-2.0 |
4 |
Width(max) |
mm |
1250 |
5 |
Coil ID |
mm |
508 |
6 |
Coil OD |
mm |
1400 |
7 |
Weight |
tons |
5tons |
8 |
Blade specification |
|
Φ220×Φ120×10 |
9 |
Material of blade |
mm |
6CrW2Si |
10 |
Line speed |
m/min |
≤40 |
11 |
Power of decoiler |
kw |
7.5 |
12 |
Power of recoiler |
kw |
11 |
13 |
Power of recoiler |
kw |
30 |
14 |
Quantity of strips can slit (Max) |
strips |
10 |
2.Composed devicesManual expand and shrink un-coiler (1 unit)
1) structure:four connection rods adjust manually and mechanically and the motor drives the steel coils doing uncoiling.
2) specification:Φ520max/480min×1250(width of roller)
3) 5.5kw frequency conversion control to make sure the speed is adjustable and it is equipped with both passive and active uncoiling models.
4) The max capacity: 7T with simple supporting stand.
Storage pit 1
It should be done according to the foundation drawings
Φ220×1250mm disc slitting machine(1 Unit)
1) specification of blades: Φ220×Φ120×10 material:6CrW2Si and 10 pieces of blades and a set of spacers and rubber rings will be provided with the machine for free(Customers can extra purchasing of the blades as per the slitting numbers )
2) thickness of material:δ=1mm.
3) width of material :B≤1250
4) electric motor:15KW frequency conversion control motor to control the speed.
5) the slitting machine is designed with entry guide device
6) slitting speed :v=40m/min
Scrap winder
Storage pit 2
It should be done according to the foundation drawings.
First pre-dividing,and press device(1 unit)
1) It is equipped with guiding and dividing devices after slitting.
2) it is also designed with the tension press which is match to the recoiler and insure the even and tight quality of recoiler.
Hydraulic cutting machine
1) double pillars cutting machine is arranged after the tension press
2) the cutting machine adopts the 9CrSi blade to ensure the cutting quality.
3)it is equipped with the independent tension station to do the cutting.
4) it is used to cutting the head and end of the coils and doing the fixed length cutting
Φ520(MAX)×1350 mechanical recoiler(1 Unit)
1) specification of shaft:Φ520/480minx1350;
2)capacity :P≤5T with simple supporting stand
3) Motor:30KW frequency conversion control motor.
4) speed:v=38m/min(average)
Second dividing and pressing device(1 unit)
1) this device cooperate with the recoiler to make sure the even quality and tight
2) the spacers are 9CrSi alloy material with the quantity 15 pieces which will be separated on three separated shafts .
Electrical control case(1 unit)
It controls the speed of the whole line. The main operation table can make the whole line change from high to low speed. And it can also make the plate into the machine manually.
3. Other terms
1) All the parts above composed the whole slitting line. It is safe and stable in actual use and is very convenient.
2) If you need add the spare parts, please do the extra purchase.
3) The price: USD47'000, FOB Shanghai.
4) We can provide the line recently as it is stocked in our workshop.
Shipping Documents:
1) Bill of Lading, one full set; 2) Commercial invoice, triplication, 3) Packing list, triplication.
Port of Shipment: Shanghai or Ningbo, China.
Port of Destination:
as per customer's request.
Delivery time: if made 1 hydraulic decoiler and 5 manual decoielrs, it will take 30days.
Terms of Payment: 1) 30% for down payment by T/T; 70% for balance by T/T before shipment.
2) 100% Irrevocable L/C at sight.
Shipping Documents:
1) Bill of Lading, one full set;
2) Commercial invoice, triplication,
3) Packing list, triplication.
Insurance: covered by the buyer.
Acceptance Certificate:The machine acceptance test will be in the seller's workshop, at the presence of the buyer's technicians while producing.
Tested materials are at seller charge (if the buyer have special request for material, the buyer shall provide the tested material by themselves).
Once the contract standard is reached, an acceptance certificate will be signed by both parties and the machine shall be considered accepted.
Guarantee Period: 12 months after custom cleared in buyer's site.
Installation/ Assembly (optional):1) After machine arrived at destination, the seller will send 1-2 technicians to the buyer's factory to install the machine, if buyer requested.
2) Installation period: 5-7 working days.
3) The buyer needs to provide some their own workers to assist the work, meanwhile, to solve the language problem of seller's technicians. Before installation, the buyer should arrange material and hydraulic oil, and build foundation for laying out the machine.
4) In addition, the buyer pays seller's technicians travel cost outside of China (including round air fare), accommodation and food (at least three-star hotel with air condition), provides necessary communication, and insurance, and etc.
5) Installation charge: US$1,000 for one machine only; this charge should be paid before technicians leave China.
6) Alternatively, the buyer can send their technicians to the seller's workshop to learn how to install the machine.
Quality/Quantity Discrepancy:In case of quality discrepancy, claim should be filed by the buyer within 15 days after the goods arrived at the port of destination. While for the quantity discrepancy, claim should be filed by the buyer within 15 days after goods arrived at the port of destination. It is understood that the seller shall not be liable for any discrepancy of the goods shipped due to cause for which the insurance company, shipping company and other transportation organization or port office are liable.
For Failure or Delay: In delivery of the entire or a portion of the goods under this contract in consequence of any force incidents, settled by negotiation.
Arbitration:All disputes arising from the execution of or in connection with this contract shall be settled amicably through friendly negotiation. In case no settlement can be reached through negotiation, the case shall then be submitted to the Foreign Trade Arbitration Commission of the China Council for the Promotion of International Trade, for arbitration in accordance with its provisional rules of procedure, the arbitral award is final and binding upon both parties.
Offer valid time: one month.
We are a manufacturer in China,
we can make machine as per as your request.
For price and other details, we welcome you to inquire us.
Please Contact Miss LucyChan