Water Drain Pipe System Roll Forming Making Machine

Product Details
Customization: Available
After-sales Service: Online Operation Training
Warranty: One Year
Manufacturer/Factory, Trading Company
Gold Member Since 2006

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001
Import & Export Mode
Have Own Export License
  • Water Drain Pipe System Roll Forming Making Machine
  • Water Drain Pipe System Roll Forming Making Machine
  • Water Drain Pipe System Roll Forming Making Machine
  • Water Drain Pipe System Roll Forming Making Machine
  • Water Drain Pipe System Roll Forming Making Machine
  • Water Drain Pipe System Roll Forming Making Machine
Find Similar Products
  • Overview
  • Product Parameters
  • Detailed Photos
  • Product Category
  • Our Service
  • FAQ
  • About Us
Overview

Basic Info.

Model NO.
WLGM
Automatic Grade
Automatic
Power Source
Electric
Screw Design
Single-Screw
Certification
CE, ISO
Condition
New
Customized
Customized
Voltage
350V/220V
Color
Client′s Request
Weight
6000kg
Thickness
0.3-0.7mm
Transport Package
According to Customer Requirements
Specification
8500*1300*1500mm
Trademark
WILLING
Origin
China
HS Code
84552210
Production Capacity
2000 Units Per Year

Product Description

NOTE: The shape of the machine may be different, but the finished product produced by the machine is the same. The shape of the machine and the finished product can be customised according to customer requirements.

Product Parameters
 
Product Name
Steel roof & wall forming machine
Material
Type
Pre-painted & galvanized steel coil
Thickness(mm)
0.3-0.7mm
Tield stress(Mpa)
Q235-345
Max.forming speed (m/min)
10-15m/min
Roller material
#45 steel with hard chrome treatment
Roller driven type
Chain transmission
Controller
PLC
Operation
Touch screen and button
Hydraulic system pressure(Mpa)
12
Main motor power(KW)
4
Hydraulic station motor power
3
Dimension (L*W*H)
about 8500*1500*1500mm
Weight (KG)
about 6000
Water Drain Pipe System Roll Forming Making Machine
Detailed Photos

Water Drain Pipe System Roll Forming Making Machine
Water Drain Pipe System Roll Forming Making Machine
Water Drain Pipe System Roll Forming Making Machine
Water Drain Pipe System Roll Forming Making Machine
Water Drain Pipe System Roll Forming Making Machine
Water Drain Pipe System Roll Forming Making Machine

Product Category
 
 
Our Service

- Provide Pre-sales Consultant & On-purchase service & After-sales service 24hr × 7days per week

- Give technical suggestion

- Test the machine before shipment

- Provide technical guidance relate to use the machine

- Supply one-year warranty period for the machine

- Provide the spare parts at cost price after warranty period

- Collect the feedback for the machine working

- Provide long-term technical assistance.

FAQ

Q1: Are you manufacturer or trading company?
A1: We are manufacturer

Q2: Do you have overseas engineers?
A2: Yes, we not only provide overseas engineers, but also provide technical training.

Q3: Do you provide customized?
A3: Sure, we can design the equipment according to your request. We are professional sheet metal forming machine designer and manufacturer.

Q4: How does your factory do regarding quality control?
A4: There is no tolerance regarding quality control. Quality control complies with ISO 9001.every machine has to past testing running before it's packed for shipment.

Q5: How can I trust you that machines pasted testing running before shipping?
A5: 1) We record the testing video for your reference
       2) We welcome you visit us and test machine by yourself in our factory.


Q6. Do you have after-sales support?
A6: Yes, we are happy to provide advice and we also have skilled technicians available to install or maintain  for your in your place. 

Q7:Can I visit you factory to check machines on-site? What Should I bring when I visit your factory?
A7: We are manufacturer, and we welcome customers to visit our factory. For special product design and develop, we request you bring a piece of testing material, you can test on our machines on-site.

Q8. What's your payment terms and delivery time?
A8: We prefer 30% as the deposit by T/T, 70% balance payment by T/T after your inspect the machine well and before delivery. Or irrevocable LC at sight is acceptable.
After we receive deposit, we will arrange production. delivery time is about 60-70 day. 

Q9: How to visit your company? 
A9: We can pick you up from Hangzhou airport. Or railway station Hangzhou or Hangzhou East.
 

About Us

Water Drain Pipe System Roll Forming Making Machine

Water Drain Pipe System Roll Forming Making Machine
 
                                             BACK HOME
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier